Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 
 
Completed Projects
 
 
PRAMODA
Pramoda

Click on image to view large
Project Details
Floor Plan
Location Plan
Payment Schedule
Gallery
 

 

 
Project Details

Structure : Column Pillar RCC Frame with 9” brick external wall 4’5” brick partition wall, Earth Quake resistand Structure and  designed  as per vaasthu.
Plastering : Inner & Outer wall plastering in cement with neat finish
Flooring : 32’ x 32’ Double Polished vitrified tiles with 4” skirting
Doors : All doors Teak with Varnish Finish with Teak frame and godrej locks
Window : Teak Wood with Varnish Finish with Teak frames with glazed. glass shutters
Plumbing & sanitary : Conclead PVC pipe line in bathrooms, PVC Rain Water, Sanitary Waste Line In Ducts, Sewage Line For Under Ground Drainage Bathrooms with Bore Well Water
Kitchen : 20mm black granite counter with stainless steel sink with drain board

Metro water point & Aqua Guard water point will be provided

Glazed tiles upto 32’.
Toilet : EWC white color (Hindware / Parryware)

Washing point / geyser point / CP fittings one shower points / glazed upto 7” height

Parry ware White Wash basin 
Painting : Interior & exterior Wall painted with emulsion paints.

Grill and- Zink with enamel paint.
Electrical : 3 Phase power supply with concealed wiring with ISI standard

White Modular switches, Earth leak circuit breaker. The electrical points  as per architects drawings
Lofts : Concrete lofts will be provided in kitchen and  bedroom
Finishes : Internal surface shall be finished with two coat of putty with acrylic emulsion paint in hall and other room.

One Prime wall in Living Hall and both Bedrooms will be finished with Royale Play Emulsion for Contemporary Premium Finish

Exterior surface shall be finished with ace acrylic emulsion.
Staircase Railing : Carved Wooden balustrades with wooden railings 
Staircase Flooring : Green Marble flooring with raiser in all steps and Landings
Rain water : As per CMDA Norms
Pest Control : Pre construction / anti termite treatment
Ceiling : False Ceiling with Imported gypsum boards finished with putty and emulsion paint in Living hall and Bedrooms.
Lighting : Light Points and fittings included in the False Ceiling
Wood Work : Modular Kitchen, Loft and Wardrobes (optional)
Page Top
 
Floor Plan
Floor Plan

Click on image to view large
Page Top
 
Location plan
Location Plan

Click on image to view large
Page Top
 
Payment Schedule

Booking Advance

10%

On Construction Agreement

10%

On UDS Registration

30%

On completion of First roof

10%

On completion of Second Roof

10%

On completion of Third Roof

10%

On completion of plastering

15%

On Handing over of possession

5%

 
 
 
 
Home - Projects - Home Loan - Joint Venture - Gallery - Contact Us - Group Company
©2010. All Rights Reserved.
Site by Hit5